Location & Job Details

  • Project: Orange Base Hospital – Helipad critical waterproofing and protection.
  • Client: Greater Western Area Health Service.
  • Applicator: TA Taylor Australia.
  • Product: POLYEURO® 5502F + Staingard Topcoat.
Orange Hospital Helipad3

On-site Requirements

  •  Seal the leaking deck and provide long term protection of concrete surface to provide a membrane impervious to water and jet fuel.
  • The coating had to provide a seamless application to the concrete surface.
  • Extremely fast cure to minimise the time the helipad was offline.
  • Provide a membrane with superior crack bridging properties – the one year old slab was leaking water into operating theatres.
Orange Hospital Helipad2

Product Requirements & Benefits

  •  Fast cure, tough, resilient and elastomeric.

  • Excellent chemical resistance properties to meet the potential exposure conditions over the expected in-service life of the product.

  • Seamless application of the coating system.

  • Abrasion and impact resistance to withstand mechanical damage from aircraft landing on the deck.