Location & Job Details
- Project: Orange Base Hospital – Helipad critical waterproofing and protection.
- Client: Greater Western Area Health Service.
- Applicator: TA Taylor Australia.
- Product: POLYEURO® 5502F + Staingard Topcoat.
![Orange Hospital Helipad3 Orange Hospital Helipad3](https://www.pacificurethanes.com/wp-content/uploads/2024/04/Screen-Shot-2024-04-23-at-4.37.27-pm.png)
On-site Requirements
- Seal the leaking deck and provide long term protection of concrete surface to provide a membrane impervious to water and jet fuel.
- The coating had to provide a seamless application to the concrete surface.
- Extremely fast cure to minimise the time the helipad was offline.
- Provide a membrane with superior crack bridging properties – the one year old slab was leaking water into operating theatres.
![Orange Hospital Helipad2 Orange Hospital Helipad2](https://www.pacificurethanes.com/wp-content/uploads/2024/04/Screen-Shot-2024-04-23-at-4.37.36-pm.png)
Product Requirements & Benefits
-
Fast cure, tough, resilient and elastomeric.
-
Excellent chemical resistance properties to meet the potential exposure conditions over the expected in-service life of the product.
-
Seamless application of the coating system.
-
Abrasion and impact resistance to withstand mechanical damage from aircraft landing on the deck.
![Orange Hospital Helipad Orange Hospital Helipad](https://www.pacificurethanes.com/wp-content/uploads/2024/04/Screen-Shot-2024-04-23-at-4.37.44-pm.png)