Location & Job Details

  • Project: South Taylor Potable Water Reservoir Waterproofing and Protection.
  • Client: Actew AGL
  • Product: POLYEURO® 5502F.
  • Volume: 3,000 square metres.
  • Applicator: CRS
  • Completion: June 2010.
South Taylor Reservoir Project3

On-site Requirements

  • Stop water leakage from the concrete reservoir.
  • Long term protection of the structure utilising a system with extensive track record in potable water projects.
  • Provide a seamless coating to the walls and onto the floor areas
  • Superior crack bridging properties.
South Taylor Reservoir Project2

Product Requirements & Benefits

  • Fast cure, tough, resilient and elastomeric.
  • All components of the system approved for use with potable water – AS/NZS 4020 : 2005.
  • Provide a specific priming system to seal the porous concrete structure and enable a pinhole free coating.
South Taylor Reservoir Project